Pages

Friday, February 15, 2008

3-in-1 bag done

1 week of knitting
1.5 machine loads of felting
70 minutes on dryer rack in dryer +1 evening air drying time
3 hrs fabric shopping
20 min to cut lining fabric
30 min machine seaming
3 hrs hand sewing
all with Zuri breaks, and it's finally done!

pre felting, yes this covers the chair!


Post felting.


Lining, with compartments for:
1. Zuri
2. Knitting
3. Me ;)

Posted by Picasa

4 comments:

  1. Only a week to knit?!?

    I don't think I saw it with the lining yet.

    That bag is awesome gurl!!

    ReplyDelete
  2. wow. that is so cool. i can't wait to see it in person. you always do such a great job!

    ReplyDelete
  3. It is even better lined! You did a great job on it - can't wait to see it all done!

    ReplyDelete